Aston Martin

Aston Martin’s first EV here in 2025

Aston Martin’s first battery electric vehicle will be here in 2025, with battery technology developed with Britishvolt.

Aston Martin says that it seeks to create the most desirable ultra-luxury performance EV, targeting new standards of repeatable on-track performance, charging time and range.

The collaboration with Britishvolt, the UK’s foremost investor in lithium-ion battery cell technologies, brings together two UK engineering companies to create the next generation of cell and battery technology designed specifically for high performance cars.

A joint research and development team from Aston Martin and Britishvolt will design, develop, and industrialise battery packs, including bespoke modules and a battery management system. The two organisations will work together to maximise the capability of special cylindrical high performance cells being developed by Britishvolt for use in high performance Aston Martin electric vehicles.

Aston Martin’s first plug-in hybrid – the mid-engine supercar Valhalla – will commence deliveries in early 2024. By 2026, all new Aston Martin product lines will have an electrified powertrain option, with a target for its core portfolio to be fully electrified by 2030.

The collaboration with Britishvolt is complementary to Aston Martin’s strategic technology agreement with Mercedes-Benz AG.

Battery pioneer Britishvolt is focused on development of next-generation battery cell technologies and associated research and development. It is dedicated to developing the future of electrified transportation and sustainable energy storage, producing best-in-class, low-carbon, sustainable, responsibly manufactured lithium-ion battery technologies.

Britishvolt’s aim is to establish the UK as the leading force in battery technology, and associated ecosystem infrastructure. It is working with leading strategic partners/suppliers to achieve this, as it is of paramount importance to the future of the UK automotive industry and the overall economic and industrial health of the country. The company is built on a foundation of ESG Principles and Commitments.

Britishvolt believes that the UK is the right place for its initial investments because of the strength of its automotive and renewable energy industry alongside its expertise and history in industrial and academic battery R&D.

2024 has been targeted as the start of production of Phase One of its first full-scale Gigaplant situated on the old coal stocking yard of the former Blyth Power Station in Cambois, Northumberland.